150 150 San Antonio Village

Board Meeting, April 29, 2026

Minutes for the San Antonio Village Homeowners’ Association Board of Directors
Monthly Meeting on April 29, 2026

The Board meeting was called to order by President Dawn Lucian at 6:00pm. Other board members present were Cindy Capra (Secretary), Mike Porter (Treasurer), Jeff Litherland (Vice President), and Patrick Pell (Member at Large). Also present were Daniel Ortiz Manager, and 9 Homeowners.

1. Dawn Lucian made a motion to approve the minutes of prior meeting held on March 18, 2026. Jeff Litherland seconded. There was a unanimous vote to approve.

2. Manager’s Report
a. Daniel requested that all Homeowners keep a close eye on the exterior of their home: trim, paint, stucco, roofing, screens, etc. He advised that the Association needs to stay on top of required or necessary maintenance as much as possible to make certain small issues don’t become worse and to maintain a sightly appearance.

3. Treasurer’s Report
a. Fiscal year 9 months through March 2026 total income is $12.8k over budget, primarily due to higher interest earnings.
b. Admin expenses – We are $13.5k over budgeted amount; there was an increase in our GL Insurance 2 months ago Feb. 2026. Salaries, supplies and professional fees all contributed to overage. There is a $1450 duplicate entry in professional fees that will be reversed next month.
c. Grounds/Landscaping – Under budget by $18.5k; the gardening team was one short in 2025 and the other savings is in tree trimming and grounds materials expenses.
d. Maintenance – Under budget by $8k; surplus in repairs/materials and pest control expenses. There will be a $3k tenting in May.
e. Utilities – Under by $2700, gas and electricity are slightly higher than budgeted; the savings is primarily due to water expense under budget by $4.5k, but we will be increasing water usage with sprinklers during the coming season.
f. Total expenses – As of 9 months of our fiscal year we are total $15.5k less expenses than budgeted. Budgeted $647k, actual $632k.
g. After rental income, other income and other expenses, the Total Income exceeded Total Expenses by $10k.

4. Architectural Change Requests:
a. 55A – Architectural review moved to next meeting.
b. 5076A – Window replacement by Davirro Construction. It was confirmed that the contractor is replacing windows and installing a new window, all would be matching color. A motion to approve was made by Dawn Lucian, Patrick Pell seconded and it was approved by all of the Board.
c. 5082A – Skylight replacement, Tubular George is proposed contractor. It has remote control, Board member remarked make sure color is consistent. Dawn moved to approve, Mike seconded, approved by all of the Board.

5. Budget Review for 2026-27
a. The budget workshop was held on Wednesday April 8th; at the workshop Cindy Capra reviewed a budget proposal that considered current fiscal year to date results, known increases in insurance costs, and current reserve recommendation from reserve study. The proposed new monthly dues would be $600/mo, a 5% increase.
b. Mike Porter shared a revised budget at tonight’s meeting of $615/mo. The recommended increases in the specific expense lines were reviewed. Compromises to increases were discussed at length.
c. Two San Antonio homeowners spoke and gave input.
d. Dawn Lucian moved to approve the revised budget of $615/mo (8% increase); Mike Porter seconded. Jeff Litherland voted yes for new budget. Cindy Capra and Patrick Pell both voted no on the proposed increase. It was passed 3/2 in favor of increasing to new amount of $615/mo.

Meeting adjourned at 7:13pm
Respectfully submitted by Cindy Capra, Secretary